US Liquid Cooling editorial · Reviewed · 4 min read
“PFAS-free” describes a chemistry claim. It does not, on its own, establish cooling performance, hardware compatibility, fire behavior, disposal requirements or approval for a particular immersion system.
For an operator choosing a fluid in 2026, the useful task is to connect that claim to a named product, supporting documentation and a validated tank-and-hardware combination.
Why is fluid selection getting more attention?
3M states that it completed its exit from PFAS manufacturing at the end of 2025. That is a concrete supply-chain event, separate from the legal status of a given fluid or the suitability of an alternative.
In Europe, ECHA's restriction registry distinguishes the broad PFAS restriction proposal, still listed in opinion development in the information reviewed for this article, from a separate decided restriction concerning firefighting foams. Do not turn those different entries into a claim that every PFAS-containing cooling fluid has the same immediate ban date.
For a purchasing decision, verify the latest applicable rules for the exact substance, use and jurisdiction with the supplier and a qualified compliance adviser. A dated general article cannot supply a permanent product-specific legal determination.
What evidence should support “PFAS-free”?
Request the definition the supplier uses, whether the statement concerns intentionally added substances or a tested detection threshold, and the documentation tied to the actual product grade.
Ask for the current technical data sheet, safety data sheet, relevant composition declaration and any test method behind the claim. Keep their revision dates with the quotation. A phrase on a distributor page is weaker evidence than product-specific documentation from the manufacturer.
Also separate the fluid claim from the rest of the installation. A PFAS-free fluid claim does not necessarily describe every seal, cable or other material in the cooling system.
Single-phase and two-phase are different design choices
A single-phase immersion fluid remains liquid during normal heat removal. A two-phase system uses boiling and condensation as part of its intended process. Their required fluid properties and system arrangements differ.
A replacement selected only because it is dielectric and has an appealing environmental description may be unsuitable for the existing architecture. Do not swap a single-phase hydrocarbon fluid into a tank designed for a specific two-phase fluid without a formally validated conversion.
Our single-phase versus two-phase guide explains the underlying distinction. The important procurement point is that chemistry and architecture are selected together.
What does a chipmaker approval cover?
Shell's 2025 Intel certification announcement describes PFAS-free immersion products and warranty-rider eligibility for specified GTL-based fluids. That is meaningful product evidence, but it does not automatically grant a warranty for every complete server, component or tank configuration.
Ask for the exact approved fluid, hardware scope, operating conditions and warranty terms. Match product identifiers rather than assuming that approval of one fluid applies to the supplier's entire portfolio.
Compare the operating evidence
Build the comparison around the actual application:
| Evidence | Why it matters |
|---|---|
| Viscosity and thermal properties at operating temperature | Fluid transport and heat transfer |
| Dielectric properties and condition monitoring | Electrical suitability over the service period |
| Materials testing | Seals, cables, plastics, labels and other wetted items |
| Fire and handling documentation | Storage, site design and operational procedures |
| Service and recovery process | Removing hardware, cleaning and managing retained fluid |
| Supply and end-of-life plan | Availability, replenishment and waste routes |
Use the tank and server vendors' acceptance criteria. A favorable value in one row cannot resolve an incompatibility in another.
The OCP immersion-cooling project lists community work on fluid specifications, material compatibility and warranty guidance. Those subjects should remain linked in a fluid review.
What should an existing installation do first?
Inventory the current fluid grade, remaining stock, supported equipment and supplier commitments. Ask whether continued operation, replenishment or conversion has a documented path. Avoid mixing an alternative into the tank as an informal trial.
For a proposed conversion, request a written procedure covering retained fluid, cleaning, materials, testing and warranty. Record who accepts the converted system. Our immersion compatibility review provides a framework for organizing that evidence.
Sources & further reading
- completed its exit from PFAS manufacturing at the end of 2025 ↗
- Registry of restriction intentions until outcome - ECHA ↗
- 2025 Intel certification announcement ↗
- immersion-cooling project ↗
Explore the company directory → · All liquid-cooling guides →